Project Details

General Contractor:

PCL Construction

Location:

Edmonton, Alberta

Duration:

2 Years

Our Role:

Detailing, production, delivery and installation of 2,500 tonnes of reinforcing steel

Considered a crown jewel in the downtown ICE District, Rogers Place is regarded among the top sports and entertainment venues in North America. To ensure the arena would be open for the start of the 2016/17 hockey season, the project was on an extremely tight schedule. A&H Steel worked closely with Terrvita on the design, constructability and installation of the pilings. We were in constant communications with PCL to ensure we were proceeding on schedule throughout the project.

The success of such a high profile and transformative project was the result of a remarkable team effort:  both internally, and in cooperation with other trades and the general contractor.